County · Texas
Collin County
Population 1,297,179 · Census Bureau Vintage-2025 estimate
Last scored Jul 13, 2026 · Data may be stale
Composite · JPAS tier readings
Power
Power reads 49 of 100, sourced evidence. Power measures grid capacity, interconnection-queue depth, generation mix, retail price and substation density. Interconnection-queue depth is an estimated roll-up (EST); queue vintage PJM 2026-04-28, CAISO 2025-02-12.
Politics
Regulatory reads 55 of 100, sourced evidence. Regulatory measures air-quality designation under the Clean Air Act and commercial permitting activity. Regulatory is evidenced by air-quality designation and permitting activity; a county absent from EPA's nonattainment list reads as attainment.
Community reads 53 of 100, sourced evidence. Community measures enacted moratoria, pending legislation and farmland share as signals of local consent.
Incentives reads 100 of 100, estimated evidence. Incentives measures state program baselines and disclosed awards for data-center and industrial projects.
Resources
Water reads 64 of 100, sourced evidence. Water measures drinking-water system health, basin stress, streamflow and groundwater conditions.
Real estate / site reads 56 of 100, sourced evidence. Real estate / site measures developable land share, convertible sites, substation hosting and permit velocity.
Environmental reads 21 of 100, sourced evidence. Environmental measures FEMA hazard risk across riverine, coastal, wind, wildfire and related perils.
Labor reads 78 of 100, sourced evidence. Labor measures electrician depth, wages, unemployment and prevailing-wage floors in the county labor market.
Connectivity
Connectivity is not yet activated as a brief section; the Network tier reading is shown.
Network reads 93 of 100, sourced evidence. Network measures broadband availability, fiber and middle-mile programs, and exchange-point proximity.
Density · JDS
Density · Active · 58 of 100
Data-center density is concentrated in this county (JDS Active, 58 of 100). County grain: computed from facilities, construction and permitted projects resolved to this county.
Trajectory · JTS
- ModeledJTS-01 Trajectory rate of change — falling — Modeled — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
- SpeculativeJTS-02 Inflection points — falling — Speculative — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
- ModeledJTS-03 Trajectory volatility — falling — Modeled — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
- SpeculativeJTS-04 Momentum — rising — Speculative — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
- SpeculativeJTS-05 Forecast confidence decay — falling — Speculative — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
Windows held: 2026. Direction and evidence label only; horizons extend only as data lands.
Water & Cooling Readiness
Water posture inferred from statewide data; no jurisdiction-level water measurement is available.
Gauge data courtesy of the U.S. Geological Survey
Local Moratorium Activity
1 data-center moratorium instrument tracked across municipalities in this county · 1 currently in force
Lavon
Data: Moratorium Nation (mjbommar) — CC-BY-4.0
JPS Score Breakdown · Jurisdiction Posture Score
Per-dimension posture values are not yet published for this jurisdiction.
Infrastructure Map
Faraday's Read
Collin County currently holds a Leading tier with a Jurisdiction Posture Score of 87.5, placing it among the stronger-positioned jurisdictions in this dataset. The underlying attribute evidence is broad, spanning environmental, power, water, network, labor, and regulatory categories, with most of these categories reaching sourced-level confidence (0.85) and an overall evidence quality rated Good against a Medium completeness grade—meaning the record covers a solid majority of expected evidence but is not yet fully built out. Incentive-related evidence, by contrast, rests on a single attribute at only estimated confidence (0.3), so that dimension should be treated as thin and not indicative of verified incentive strength. There is no recorded facility activity in the data—zero total, operational, or megawatt figures—and jurisdiction-level development density (jds) is unscored, so any claims about actual data center buildout in Collin County would be unsupported. The posture forecast direction is listed as stable, though this comes with an unscored confidence label, so that outlook should be read as a weak signal rather than a firm projection.
Gilbert Faraday · Jul 17, 2026
Recent Signals
No signal events in the past 30 days for this jurisdiction.