County · Minnesota
Hennepin County
Population 1,284,784 · Census Bureau Vintage-2025 estimate
Last scored Jul 13, 2026 · Data may be stale
Composite · JPAS tier readings
Power
Power reads 43 of 100, sourced evidence. Power measures grid capacity, interconnection-queue depth, generation mix, retail price and substation density. Interconnection-queue depth is an estimated roll-up (EST); queue vintage PJM 2026-04-28, CAISO 2025-02-12.
Politics
Regulatory reads 77 of 100, sourced evidence. Regulatory measures air-quality designation under the Clean Air Act and commercial permitting activity. Regulatory is evidenced by air-quality designation and permitting activity; a county absent from EPA's nonattainment list reads as attainment.
Community reads 46 of 100, sourced evidence. Community measures enacted moratoria, pending legislation and farmland share as signals of local consent.
Incentives reads 100 of 100, estimated evidence. Incentives measures state program baselines and disclosed awards for data-center and industrial projects.
Resources
Water reads 68 of 100, sourced evidence. Water measures drinking-water system health, basin stress, streamflow and groundwater conditions.
Real estate / site reads 38 of 100, sourced evidence. Real estate / site measures developable land share, convertible sites, substation hosting and permit velocity.
Environmental reads 29 of 100, sourced evidence. Environmental measures FEMA hazard risk across riverine, coastal, wind, wildfire and related perils.
Labor reads 66 of 100, sourced evidence. Labor measures electrician depth, wages, unemployment and prevailing-wage floors in the county labor market.
Connectivity
Connectivity is not yet activated as a brief section; the Network tier reading is shown.
Network reads 84 of 100, sourced evidence. Network measures broadband availability, fiber and middle-mile programs, and exchange-point proximity.
Density · JDS
Density · Emerging · 37 of 100
Data-center density is emerging in this county (JDS Emerging, 37 of 100). County grain: computed from facilities, construction and permitted projects resolved to this county.
Trajectory · JTS
- ModeledJTS-01 Trajectory rate of change — falling — Modeled — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
- SpeculativeJTS-02 Inflection points — falling — Speculative — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
- ModeledJTS-03 Trajectory volatility — falling — Modeled — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
- SpeculativeJTS-04 Momentum — rising — Speculative — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
- SpeculativeJTS-05 Forecast confidence decay — falling — Speculative — covers 2026 Posture-series attributes were computed over an eight-week window that spans Faraday methodology changes; they partly measure recompute churn, not jurisdiction behaviour.
- ModeledJTS-06 Substation & transmission build trajectory — flat — Modeled — covers 2026
- ModeledJTS-07 Utility capital investment trend — rising — Modeled — covers 2020–2025
Windows held: 2026 · 2020–2025. Direction and evidence label only; horizons extend only as data lands.
Commercial Permit Activity
9 permits in this jurisdiction · 0 over 10,000 sq ft
Commercial · electrical · new-construction permits filed 2024+ (Shovels.ai)
Water & Cooling Readiness
Water posture inferred from statewide data; no jurisdiction-level water measurement is available.
Gauge data courtesy of the U.S. Geological Survey
Local Moratorium Activity
3 data-center moratorium instruments tracked across municipalities in this county · 3 currently in force
Minneapolis · Minnetrista · Plymouth
Data: Moratorium Nation (mjbommar) — CC-BY-4.0
JPS Score Breakdown · Jurisdiction Posture Score
Per-dimension posture values are not yet published for this jurisdiction.
Infrastructure Map
Faraday's Read
Hennepin County currently carries a Favorable jurisdiction posture score of 75, with permitting cited as a relative strength among its scored dimensions. The attribute evidence base is broad, spanning environmental, labor, network, power, regulatory, and water categories, and much of it is sourced with a confidence level of 0.85, though quality sits in the Moderate band and completeness is graded Medium, suggesting the record is solid but not exhaustive. The county moved from a Cautious to a Favorable tier in early July 2026, a shift tied to a permit-velocity composite update and a subsequent scale migration, though no analyst narrative accompanies that transition. Development density data is absent, and no facilities are currently recorded as operational or in the pipeline, so the jurisdiction's actual buildout track record remains unknown. The forecast direction is described as stable, but that signal itself is unscored, meaning confidence in near-term trajectory should be treated as thin rather than established.
Gilbert Faraday · Jul 17, 2026
Recent Signals
No signal events in the past 30 days for this jurisdiction.